Official source
MITECO - Sistemas colectivos RAP (miteco.gob.es), abgerufen 11.09.2026
Vorläufige Zulassung | Haushalt MW, Gewerbe EW+MW, Industrie EW+MW
Rates in detail
no published unitary tariff yetThis scheme has no checked public unitary tariff here yet. In competitive markets, prices are often negotiated individually.
Scheme tariff figures
2026-10-28From the scheme’s published materials. Not yet fully verified — confirm against the original source before use.
| Figure | Context |
|---|---|
| 2.001€ | :"list","format":"unordered","children":[{"type":"list-item","children":[{"text":"🔺 Multa de entre 2.001€ y 100.000€ en el caso de residuos no peligrosos.","type":"t |
| 100.000€ | format":"unordered","children":[{"type":"list-item","children":[{"text":"🔺 Multa de entre 2.001€ y 100.000€ en el caso de residuos no peligrosos.","type":"text"}]},{"t |
| 20.001€ | esiduos no peligrosos.","type":"text"}]},{"type":"list-item","children":[{"text":"🔺 Multa de entre 20.001€ y 600.000€ en el caso de residuos peligrosos.","type":"text |
| 600.000€ | peligrosos.","type":"text"}]},{"type":"list-item","children":[{"text":"🔺 Multa de entre 20.001€ y 600.000€ en el caso de residuos peligrosos.","type":"text"}]}]},{"ty |
- <!DOCTYPE html><html lang="es" data-critters-container><head><script>(function(w,i,g){w[g]=w[g]||[];if(typeof w[g].push=='function')w[g].push(i)}) (window,'GTM-P99Q3GNX','google_ta